PUBLIC NOTICE: Palmdale to Burbank Project Section Draft EIR/EIS Availability and Hearing

Posted on 09/02/22

Sunland-Tujunga Neighborhood Council

PUBLIC NOTICE - Palmdale to Burbank Project Section

 

California High-Speed Rail – 
Palmdale to Burbank Project Section

NOTICE OF AVAILABILITY /
NOTICE OF PUBLIC HEARING

DRAFT ENVIRONMENTAL IMPACT REPORT/
ENVIRONMENTAL IMPACT STATEMENT

The California High-Speed Rail Authority (Authority) announces the availability of the Palmdale to Burbank Project Section Draft Environmental Impact Report / Environmental Impact Statement (EIR/EIS). The Draft EIR/EIS has been prepared and is being made available pursuant to both the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA).

The Palmdale to Burbank Project Section Draft EIR/EIS and associated documents will be available to the public on September 02, 2022.

The Palmdale to Burbank Project Section Draft EIR/EIS is available online in PDF at the Authority’s website (www.hsr.ca.gov) or you can request an electronic copy by calling (800) 630-1039.

The environmental review, consultation, and other actions required by applicable federal environmental laws for this project are being or have been carried out by the State of California pursuant to 23 U.S. Code 327 and a Memorandum of Understanding (MOU) dated July 23, 2019, and executed by the Federal Railroad Administration (FRA) and the State of California. Under that MOU, the Authority is the project’s lead agency under NEPA. Prior to the July 23, 2019 MOU, the FRA was the federal lead agency. The Authority is also the lead agency under CEQA.

JUMP TO:


PROPOSED PROJECT AND LOCATION

A Statewide Program (Tier 1) EIR/EIS was completed in November 2005 as the first phase of a tiered environmental review process for the proposed California High-Speed Rail (HSR) System planned to provide a reliable high-speed electric-powered rail system that links the major metropolitan areas of the state and that delivers predictable and consistent travel times. A further objective is to provide an interface with commercial airports, mass transit, and the highway network and to relieve capacity constraints of the existing transportation system as increases in intercity travel demand in California occur, in a manner sensitive to and protective of California’s unique natural resources.

The Authority has prepared a project-level (Tier 2) Draft EIR/EIS that further examines the Palmdale to Burbank Project Section. This approximately 31-38 mile project section would provide HSR service between the Palmdale Station and the Burbank Airport Station. The Draft EIR/EIS provides information regarding both the Palmdale Station and the Burbank Airport Station in various sections throughout Chapter 3, Affected Environment, Environmental Consequences, and Mitigation Measures. Both of these stations were approved by the Authority Board of Directors as part of other project sections. The Palmdale Station was approved by the Authority Board of Directors as part of the Bakersfield to Palmdale Project Section in August 2021, while the Burbank Airport Station was approved as part of the Burbank to Los Angeles Project Section in January 2022. In light of these prior approvals, commenters are encouraged to focus their comments on the Central Subsection of the Palmdale to Burbank Project Section as shown in Figure 1.

This Draft EIR/EIS evaluates the impacts and benefits of a No Project Alternative and six Build Alternatives (Figure 1) connecting the two approved stations. The Authority’s Preferred Alternative under NEPA, which serves as the proposed project for CEQA, is the SR14A Build Alternative. The Preferred Alternative would follow an alignment that heads southwest from the city of Palmdale through the Angeles National Forest, including the San Gabriel Mountains National Monument, and then continues into the San Fernando Valley where it would connect with the approved HSR station at the Hollywood Burbank Airport.

ANTICIPATED IMPACTS

Significant pre-mitigation environmental effects resulting from the Palmdale to Burbank Build Alternatives are anticipated in the following resource areas: transportation (construction impacts); air quality and global climate change (construction impacts); noise and vibration (construction and operation impacts); electromagnetic fields and electromagnetic interference (construction and operation impacts); public utilities and energy (construction); biological and aquatic resources (construction and operation impacts); hydrology and water resources (construction impacts); geology, soils, seismicity, and paleontological resources (construction impacts); hazardous materials and wastes (construction and operation impacts); safety and security (operation impacts); socioeconomics and communities (construction and operation impacts); station planning, land use, and development (construction impacts); agricultural lands (construction impacts); parks, recreation, and open space (construction impacts); aesthetics and visual quality (construction impacts); and cultural resources (construction impacts). 

HAZARDOUS WASTE SITES

There are three sites identified on hazardous waste lists enumerated under Section 65962.5 of the California Government Code (Cortese List) that occur in proximity to the project. These sites are Crane Company (3000 Winona Avenue, Burbank, 91504), Holochem, Inc. (13546 Desmond Street, Pacoima, 91331), and Lubrication Company of America (12500 Lang Station Road, Santa Clarita, 91351).

PUBLIC REVIEW PERIOD

The Authority is making this Draft EIR/EIS available in accordance with CEQA and NEPA for a minimum 45-day public review and comment period. During the comment period, written comments may be submitted in the following ways:

  • By mail to Attn: “Palmdale to Burbank Draft EIR/EIS Comment”, California High-Speed Rail Authority, 355 S. Grand Avenue, Suite 2050 Los Angeles, CA 90071; 
  • Through the Authority’s website (www.hsr.ca.gov); 
  • By email to [email protected] with the subject line “Palmdale to Burbank Draft EIR/EIS Comment”;
  • Verbal comment on the direct phone line for the Palmdale to Burbank Project Section at (800) 630-1039; and
  • Oral testimony at the online Public Hearing to be held on October 18, 2022, from 3:00 to 8:00 p.m.

The comment period begins on September 02, 2022, and ends on November 01, 2022. Comments must be received electronically or postmarked on or before 5:00 p.m. PDT November 01, 2022. 

After the public review period, the Authority will prepare a Final EIR/EIS, which will include responses to comments received during the comment period. The Authority may in its discretion opt to issue a single document that consists of the Final Environmental Impact Statement and Record of Decision pursuant to 49 U.S.C. 304a(b) and 23 U.S.C. 139(n)(2). In evaluating whether to issue a combined Final Environmental Impact Statement/Record of Decision, the Authority will consider whether statutory criteria or practicability considerations preclude issuance of such a combined document.

OPEN HOUSE AND PUBLIC HEARING

The Authority invites you to attend the online Open House and the online Public Hearing listed below to obtain more information about the Draft EIR/EIS and the six Build Alternatives. The online Public Hearing will include a short Open House portion and presentation regarding the Draft EIR/EIS comment process, then an online Public Hearing during which members of the public can formally submit an oral comment on the Draft EIR/EIS. Due to public health and safety concerns regarding the COVID-19 pandemic, the public Open House meeting and Public Hearing will be held online and via telephone.

Intérpretes de español estarán en las reuniones. Other language requests and requests for reasonable accommodations must be submitted 72 hours in advance of the scheduled meeting date. Please contact (800) 630-1039 or the California Relay Service at 711 to request interpreters. A court reporter, who is fluent in Spanish, will be available at the Public Hearing to record oral comments in English and Spanish. 

Below is a list of the online Open House meeting and online Public Hearing dates:
 


October 6, 2022
5:00 – 7:30 p.m. 

Online Public Open House Meeting 
Online and via Telephone

Thursday, October 6, 2022

English presentation:
5:00 6:30 p.m.

Spanish presentation:
6:30 7:30 p.m.
 
Online Public Hearing

October 18, 2022
3:00 – 8:00 p.m.

 
Online Public Hearing
Online and via Telephone

Tuesday, October 18, 2022
3:00-8:00 p.m.

Please check the Authority website (www.hsr.ca.gov) for more information, including up-to-date information on the planned Open House and Public Hearing and how to access them. 

COPIES OF THE DRAFT EIR/EIS

Please visit the Authority website (www.hsr.ca.gov) where you may view and download Volumes 1, 2, and 3 of the Draft EIR/EIS and other project materials. You may also request an electronic copy of the Draft EIR/EIS by calling (800) 630-1039. Electronic copies of the technical reports are also available on request by calling the Authority office at (800) 630-1039.

Printed and/or electronic copies of the Draft EIR/EIS will be available at the following repository locations during facility operating hours. Open days/hours may be reduced in compliance with COVID-19 public health and safety directives.

Repository Locations
Los Angeles County Library, Acton/Agua Dulce Library 33792 Crown Valley Road, Acton, CA 93510
Los Angeles County Library, San Fernando Library 217 North Maclay Avenue, San Fernando, CA 91340
Los Angeles Public Library, Lake View Terrace Branch Library 12002 Osborne Street, Lake View Terrace, CA 91342
Los Angeles Public Library, Pacoima Branch Library 13605 Van Nuys Boulevard, Pacoima, CA 91331
Los Angeles Public Library, Sun Valley Branch Library 7935 Vineland Avenue, Sun Valley, CA 91352
Los Angeles Public Library, Sylmar Branch Library 14561 Polk Street, Sylmar, CA 91342
Los Angeles Public Library, Sunland-Tujunga Branch Library 7771 Foothill Boulevard, Tujunga, CA 91042
Palmdale City Library 700 East Palmdale Boulevard, Palmdale, CA 93550
Santa Clarita Public Library, Canyon Country Jo Anne Darcy Library 18601 Soledad Canyon Road, Santa Clarita, CA 91351
Burbank Public Library, Northwest Branch Library 3323 West Victory Boulevard, Burbank, CA 91505

Printed and/or electronic copies of the Draft EIR/EIS and Tier 1 documents are also available for review during business hours at the Authority’s Headquarters at 770 L Street, Suite 620 MS-1, Sacramento, CA and by appointment at the Authority’s Southern California Regional Office at 355 S. Grand Avenue, Suite 2050, Los Angeles, CA. To make an appointment to view the documents at the Southern California Regional Office, please call 800-630-1039.

The Bakersfield to Palmdale Project Section Final EIR/EIS (2021) and the Burbank to Los Angeles Final EIR/EIS (2022) may be reviewed on the Authority’s website at www.hsr.ca.gov and are also available for review at the Authority’s offices as specified above. Authority offices may have reduced open days/hours, due to COVID-19 public health and safety directives. Please consult www.hsr.ca.gov for up-to-date information.

The Authority does not discriminate on the basis of disability and, upon request, will provide reasonable accommodation to ensure equal access to its programs, services, and activities.

INTERPRETATIONS / TRANSLATIONS

If you need help translating or interpreting this letter, Arabic, Armenian, and Spanish speaking staff are available to help you. Call (800) 630-1039 if you wish to request this service.  ÔµÕ©Õ¥ Õ¡ÕµÕ½ Õ¶Õ¡Õ´Õ¡Õ¯Õ« Õ£Ö€Õ¡Õ¾Õ¸Ö€ Õ¯Õ¡Õ´ Õ¢Õ¡Õ¶Õ¡Õ¾Õ¸Ö€ Õ©Õ¡Ö€Õ£Õ´Õ¡Õ¶Õ¸Ö‚Õ©ÕµÕ¡Õ¶ Õ°Õ¡Õ´Õ¡Ö€ Ö…Õ£Õ¶Õ¸Ö‚Õ©ÕµÕ¡Õ¶ Õ¯Õ¡Ö€Õ«Ö„ Õ¸Ö‚Õ¶Õ¥Ö„, Õ¯Õ¡Õ¶ Õ°Õ¡ÕµÕ¥Ö€Õ¥Õ¶Õ¡Õ­Õ¸Õ½ Õ¡Õ¶Õ±Õ¥Ö€, Õ¸Õ¾Ö„Õ¥Ö€ Õ¿Ö€Õ¡Õ´Õ¡Õ¤Õ«Ö€ Õ¥Õ¶ Ö…Õ£Õ¶Õ¥Õ¬Õ¸Ö‚ Õ�Õ¥Õ¦: Ô½Õ¶Õ¤Ö€Õ¸Ö‚Õ´ Õ¥Õ¶Ö„ Õ¦Õ¡Õ¶Õ£Õ¡Õ°Õ¡Ö€Õ¥Õ¬ (800) 630-1039 Õ°Õ¡Õ´Õ¡Ö€Õ¸Õ¾:

Si necesita ayuda traduciendo o interpretando esta carta, hay personal disponible que habla español para ayudarle. Llame al (800) 630-1039 si desea solicitar este servicio.

MAP (FIGURE 1)

A detailed complex map for the alternatives under consideration for the route of the system from Palmdale to Burbank. More detailed descriptive text available by contacting the Authority at info@hsr.ca.gov.

© Sunland-Tujunga Neighborhood Council. All rights reserved.

Accessibility     Privacy Policy

Join Our Mailing List

Web Design by The Web Corner

© Sunland-Tujunga Neighborhood Council.
All rights reserved.
Accessibility
Privacy Policy

Join Our Mailing List